MBTA Orange Line train door stuck, local media frenzy follows
Image via WCVB
– News covered by Quincy Quarry News with commentary added.
Orange Line train door fails during the second day of the resumption of rail service along the Orange Line after the line was shutdown for a month-long maintenance makeover.
And yes, the stuck door was on one of the new Orange Line trains.
Even so, Quincy Quarry News’ touts on its gaming desk do not rate this single train incident as qualifying for a win for cynical local bettors who took the under on the over and under line as to when the Orange Line would suffer its first major breakdown after its maintenance makeover.
Also note that the Quarry’s touts have closed the book on taking bets on when the Orange Line will suffer a serious fail.
Orange Line Update: Northbound trains are delayed about 20 minutes due to a train with a door problem at Downtown Crossing northbound. https://t.co/0JoqZ770zK
— MBTA (@MBTA) September 20, 2022
Source: Delays Reported on MBTA’s Orange Line on Second Day of Restored Train Service
Visit Quincy Quarry Instagram Page
QuincyQuarry.com
Quincy News, news about Quincy, MA - Breaking News - Opinion
No more posts