MBTA Orange Line train door stuck, local media frenzy follows

 

Image via WCVB

 

– News covered by Quincy Quarry News with commentary added.

 

| quincy news

Still waiting …
Image via Lost in New England/Curbed Boston

Orange Line train door fails during the second day of the resumption of rail service along the Orange Line after the line was shutdown for a month-long maintenance makeover.

And yes, the stuck door was on one of the new Orange Line trains.

Even so, Quincy Quarry News’ touts on its gaming desk do not rate this single train incident as qualifying for a win for cynical local bettors who took the under on the over and under line as to when the Orange Line would suffer its first major breakdown after its maintenance makeover.

Also note that the Quarry’s touts have closed the book on taking bets on when the Orange Line will suffer a serious fail.

Source: Delays Reported on MBTA’s Orange Line on Second Day of Restored Train Service

View this post on Instagram

Visit Quincy Quarry Instagram Page

QQ Disclaimer

 

 
 
 
 
 
 
 
 

Pin It on Pinterest